Section 7 Environmental Effects of the Selected Plan
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
7-27
reservoir area is also anticipated. The need for additional required utility
relocation may be found once pre-construction project survey information is
available.
7.20.3 Effects to Roadways:
New Structure on U.S.-27
- A new structure (S-609) will need to be constructed
on U.S.-27 in order to provide access from the EAA Reservoir Cell 1 to the NNR
Canal. This will be a new bridge or gated culvert structure. Design and
construction of this structure, bridge or culvert, will be done in close coordination
with FDOT since the beginning of the Design Phase. The structure would be
designed and constructed in accordance with both FDOT and USACE standards.
When in conflict, the most stringent standard will apply. Construction of the
structure will be done in a manner in which traffic will be maintained at all
times. This will be accomplished by constructing one half of it at a time,
alternating one way traffic. All support infrastructure, safety, signage, flagging,
etc. requirements will be included in the design.
7.20.4 Summary of Improvements
1. North New River (NNR) - Structures are itemized from north towards
south along the canal. The following structures exist along the banks of
the NNR or cross over it.
Railroad Bridges 1
Owned by Florida East Coast Railway. Located 1,330 LF
north of SR-80 along the NNR. Bridge affected by canal
enlargement and will have to be replaced.
FDOT Bridges 2
One is the SR-80 bridge over NNR, and the second is the
SR-827 bridge over NNR. Bridge affected by canal
enlargement and will have to be replaced.
Privately Owned Bridges 9
Mainly owned by agricultural companies in the area.
Providing access from sugar cane fields east of NNR to
U.S. 27 on the west side. Bridge affected by canal
enlargement and will have to be replaced.
Privately Owned Pump Stations
and Intake Structures
10
Mainly owned by agricultural companies in the area.
Supplying water from NNR to sugar cane fields. Intake
structures consist of submerged pipes with a few Ogee
type spillways. Intake structures affected by canal
enlargement and will have to be replaced. Pump stations
are mostly far enough from NNR bank probably not to be
affected by project.
Other Structures 9
Mainly owned by agricultural companies in the area.
Supplying water from NNR to sugar cane fields. Intake
structures consist of gated pipe culverts and Ogee type
spillways. Intake structures affected by canal
enlargement and will have to be replaced.