Section 6 The Selected Alternative Plan
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
6-10
River Canal channel improvement is constrained by U.S. 27 on the west bank.
All of this work is planned to be performed within the existing SFWMD right of
way of the North New River Canal
6.1.6.3 Bolles and Cross Canals
Improvements to the Bolles and Cross Canals will allow water from Lake
Okeechobee and the northern portion of the EAA to be more effectively routed to
the south. The design capacity determined for these canals is 1,500 cfs. The
existing capacities of these canals are severely limited due to their shallowness.
The increase in capacity requirements necessitated an enlargement of the entire
reach of both canals. The length of Bolles and Cross Canals are approximately
7.7 and 8.8 miles, respectively. All of this work will be performed within the
existing SFWMD right of way of the Bolles and Cross Canals. The location of the
Bolles and Cross Canals are shown on Figure 6-3.
FIGURE 6-3: BOLLES AND CROSS CANALS
6.1.7 Levees
The reservoir has perimeter levees, L-601 and L-602, with a minimum height of
23 feet above average ground for both earthen and RCC designs. The height of
the internal levee L-601i is 21 and 19.2 feet above average ground for the
earthen and RCC designs, respectively.