Section 6 The Selected Alternative Plan
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
6-22
6.4.2.3.2 Construction Materials
The superstructures for all pumping stations are constructed with reinforced
concrete. For large pumping stations, the substructure is constructed with mass
concrete. Substructures for medium and small pumping stations are constructed
with reinforced concrete.
6.4.2.4 Bridges
The S-609 box culvert structure will be constructed underneath U.S. Highway
27. This structure will serve as a hydraulic connection between the EAA
reservoir and the North New River Canal. More detail on structure S-609 is
provided in Section A-2.4.2.2.1.2 and Plate C-5 in the Engineering Appendix
(Appendix A).
Bridge relocations will be required due to channel improvements in the Miami,
North New River, Bolles and Cross Canals.
6.4.3 Mechanical and Electrical Requirements
6.4.3.1 Utility Relocation
6.4.3.1.1 General
Since the EAA is located in a rural and largely undeveloped area in
southwestern Palm Beach County, the need for utility relocation has been
minimized. Conflicts with existing or proposed utilities have been avoided by
design modification whenever possible. All known necessary utility relocations
are detailed in Appendix A, since accounting for the impact of any construction
interference is an essential part of project planning.
Conveyance canal improvements for the North New River canal will involve
widening of the canal, and, because of this work, utility relocation is anticipated
in conjunction with the replacement of two bridges. Fiber optic communication
lines are attached to one bridge, and a water main to the other. Relocation of
utilities attached to bridges will be included as part of the bridge construction
project. A high voltage electrical transmission line, and an aerial electrical
distribution line and telephone line will also require relocation due to canal
improvements near Lake Okeechobee. Relocation of an overhead electrical
distribution line and telephone line the crosses through the reservoir area is also
anticipated. The need for additional required utility relocation may be found
once pre-construction project survey information is available.