Section 5 Formulation of Alternative Plans
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
5-62
groups (“1” means no acceptance, “6” means greatest acceptance among
stakeholders). Effectiveness is based on achievement of planning objectives and
generation of habitat units (“1” represented the alternative with the least
number of planning objectives while a “6 “represented the alternative the
achieved the greatest number of planning objectives). Completeness is uniform
for each of the project alternatives, and therefore is not included in the
evaluation matrix.
5.4.6 Plan Comparison using Cost-Effectiveness and Incremental Cost Analyses
(CE/ICA)
Cost-effectiveness analysis begins with a comparison of the costs and outputs of
alternative plans to identify the least cost plan for every level of output
considered. Alternative plans are compared to identify those that would produce
greater levels of output at the same cost, or at a lesser cost. Alternative plans
identified through this comparison are the cost-effective alternative plans. Next,
through an incremental cost analysis, the cost-effective alternative plans are
compared to identify the most economically efficient alternative plans, that is,
the “Best Buy” alternative plans that produce the “biggest bang for the buck.”
Cost-effective plans are compared by examining the additional (incremental)
costs for the additional (incremental) amounts of output produced by
successively larger cost effective plans. The plans with the lowest incremental
costs per unit of output for successively larger levels of output are the “Best Buy”
plans. The results of these calculations and comparisons of costs and outputs
between alternative plans provide a basis for addressing the decision question
“Is it worth it?”
System formulation outputs used for CE/ICA are displayed in Table 5-21. The
basis for average annual output calculations was previously explained. Note
that the output values reflect the differences between without project and with
project on an average annual basis (i.e., ecological “lift” provided by each of the
alternatives).