Section 6 The Selected Alternative Plan
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
6-31
center. The access for the RTU to the control center is via microwave gateway.
The automation components of all pump stations and structures that will
eventually be operated and maintained by SFWMD and must conform to
SFWMD standards in order to (1) achieve cost efficiency in design, construction,
operation and maintenance, and, (2) meet safety, reliability, and performance
requirements during routine and emergency operations. The automation
components are broadly defined to include hardware, software, communications
and user interface elements.
6.5 LERRD CONSIDERATIONS
6.5.1 Lands and Interests in Lands and Costs
6.5.1.1 Existing Federal Project
The Miami Canal (L-25, L-24 and L-23) and the North New River Canal (l-20, L-
19 and L-18) are all part of the original C&SF Project and lie fully or partially
within the lands required for construction, operation, maintenance, repair,
replacement and rehabilitation of the Project. All improvements to the Miami
Canal will be conducted within the existing right of way owned in fee or
perpetual easement by SFWMD. All improvements to the North New River
Canal will be conducted within the existing right of way owned in fee or
perpetual easement by SFWMD. SFWMD will not receive credit for the provision
of these lands or interests in land for the EAA Reservoir Project. The interests
owned by SFWMD will be the required estate for these lands.
6.5.1.2 Compartment A
Fee title will be required for the project footprint of the EAA Reservoir, the
seepage buffer area, and seepage canals. The EAA Reservoir, the seepage buffer
area, and seepage canals require 30,735.48 acres in Compartment A, of which
29,749.18 acres were acquired in the Talisman exchange/acquisition. The
remaining 966 acres in Compartment A were acquired by SFWMD. In March
1999, the “Talisman Exchange and Purchase and Sale Agreement” effected
transactions pursuant to which the landowners in the EAA would sell lands to,
or exchange lands, with other landowners and the SFWMD in order for SFWMD
to own contiguous parcels of land in the southern portion of the EAA for the
purposes of Everglades restoration. As part of the transaction, SFWMD
contributed total payment to buy out the farming reservation held by the St. Joe
Paper Company. As per the terms of the Cooperation Agreement between the
SFWMD and the DOI, SFWMD elected to apply program income revenue
towards the repayment of its contribution. If the program income revenue does
not totally satisfy the repayment of SFWMD’s contribution, SFWMD will seek
credit for the balance of its contribution as an allowable project expense for cost-
sharing purposes. The federal funds contributed by DOI pursuant to the Farm
Przeglądanie stron 258
1 2 ... 254 255 256 257 258 259 260 261 262 263 264 ... 385 386

Komentarze do niniejszej Instrukcji

Brak uwag